Apply online for New Domestic Connection
To Complete this application on line you will need the following:
Please provide ITM Grid Co ordinates of the exact location of where the electricity supply is required. Online help is provided within the NC2 Online application form.
A fuller explanation can be found within the NC2 online form
You can request either 24hr metering or Time of Day (i.e. Day and Night) metering. If your night electrical load is substantial (e.g. Where night storage heating, electrical under floor heating / heat pumps are being considered) Day and night metering may be suitable.
Once applied for this can then only be changed after energisation through a request to your electricity supplier
You will need to know the input loading for your electrical equipment. e.g. heating load in kW, heat pump starting current and time interval between starts etc.
Requests for this type of connection can be applied for in writing. How to connect a micro-generator to the electricity network
This application is for an electricity connection only. After you receive an offer from us and make the required payment, you will also need to make contact with an electricity supplier at the same time. You can get a list of suppliers using this link
Applications for supply with addresses in Northern Ireland please complete a manual application form (PDF | 198KB ).
Apply online for a Reconnection.
This Online Application only applies to premises de-energised for more than 2 years.
To Complete this application on line you will need the following:
A Meter Point Reference Number (MPRN) is a unique 11 digit number assigned to every single electricity connection and meter in the country. An example of what an MPRN number looks like is: 10009998888 and this MPRN is prominently displayed on electricity bills.
Reconnection of a premise can only be carried out with the metering type that was installed at time of de-energisation.
You will need to know the input loading for your electrical equipment. e.g. heating load in kW, heat pump starting current and time interval between starts etc.
Apply online for a change of Connection Capacity (MIC)
To Complete this application on line you will need the following:
A Meter Point Reference Number (MPRN) is a unique 11 digit number assigned to every single electricity connection and meter in the country. An example of what an MPRN number looks like is: 10009998888 and this MPRN is prominently displayed on electricity bills.
You will need to know the input loading for your electrical equipment. e.g. heating load in kW, heat pump starting current and time interval between starts etc.
An Irish Version of the online application form is under development and will be available shortly. Click the link below to download a printable Irish language version of the NC2 form which can be posted. NC2 form (PDF | 198KB )